Tiny House Timeline


Work Begins
May 8, 2014
Steel tube is purchased and we start cutting


Trailer Frame
May 31, 2014
Fabrication of the main trailer frame and dolly (welding and priming) is done (8'x35')


Trailer and Slideout
August 2, 2014
Lights, hitch, and safety gear installed, slideout working, and test drive completed (3,000 lbs.)


Shell Frame
August 16, 2014
Steel cage for the walls and roof is welded


Floor
August 20, 2014
Steel studs, foam panels, and subfloor are installed


Steel Studs & Insulation
September 1, 2014
Steel studs and foam panels installed on trailer and slideout


Metal Roof
September 8, 2014
OSB decking, Ice & Water shield, Rain Vent battens, and metal roofing completed


Exterior Siding & Trim
October 8, 2014
Metal siding, trim, windows, doors, and reclaimed barn wood siding finished


Electrical
November 27, 2014
Outlets, switches, and lights are wired and 100A load panel is completed


Interior Wall Prep
December 26, 2014
Hardboard panels, spackle, sanding, wood trim on the windows, and primer.


Interior Walls Painted
January 26, 2015
Priming hardboard panels, taping, mudding, sanding and painting.


Bathroom
March 3, 2015
Tile with in-floor heating, pebble mosaic sloping waterfall shower, Formica shower walls, custom tiled shower shelf, built-in cedar-lined shelves, and modern sliding barn door.


Wardrobe Closet
March 24, 2015
4 full-size 180-degree doors, modern metal hardware, motion-sensing lighting, double-decker closet poles, full-body mirrors, and cedar-lined washer/dryer station.


Kitchen
April 8, 2015
Custom frameless cabinets with soft-close Euro hinges, oven, dishwasher, fridge, microwave, hot/filtered water tap, and pantry shelving.


Moved In
May 1, 2015
Exactly one year after we started, we moved in!